Record of Monthly Generation (kWh)

 

The table below is a record of the units of electricity generated each month since the Hydro was commissioned.

10% (approx.) of the electricity is supplied to Bridge End Mill and the remaining 90% (approx.) is supplied to the National Grid.

 

 2010

2011

2012201320142015201620172018201920202021202220232024
Jan657282171942287010 (ii)140321642475481433959551266712577106281604513785
Feb582872111138561330 (ii)7169115831013663578520145891111219496960018594
Mar61172691326132660 (ii)1144182659984548213747105007606

3223

1323015142
Apr453831391002836830 (ii)4172388279374314230 (v)0 (v)2753641411429
May0 (i)4501392067656799109149751213138 (iv)2214(v)9396181718936136
Jun0 (i)5276737203491187628081969(iv)67961178 (v)(v)

725(v)

870

3636
Jul5510651024824060

572

(i)75985820314 (iv)310353847992491109252253
Aug6704737813420726187686077(iii)730367646929973466582906140177106774
Sept11597137331074523500 (i)38375989728781601145965642236298943724564
Oct96908867316312512106595708178712103472713167129251395713711128048691
Nov103463593864814311132817768936770557629980011449118771619816525 
Dec390423303149180 (ii)15440210365878998116937145531591215894832120405 
Annual70806944191087645612257057

104030

818597993974755100471978268836083753120793 

       

Notes 
(i)No generation due to a prolonged period of low river level
(ii)No generation due to a prolonged breakdown due to failed lower bearing
(iii)Generation restricted during installation of new Variable Speed Control System
(iv)Low generation due to very dry summer
(v)Low generation due to very low rainfall

      